STATUSCONSTRUCTION STAGE

STATUSCONSTRUCTION STAGE

According to plan, construction on the first phase of the HANN Harmony residential complex has started in the spring of 2023. At the present moment, works at the site are moving forward as expected, so that our project is slowly taking shape. We want to treat each step of the construction process with a maximum of consideration, so the estimated delivery date for the first 62 villas is set for the autumn of 2024, while the other 62 units in the first development stage of the project will be completed at the end of 2024.

See the current construction stage!

ABOUT PROJECTHANN Harmony

START DATESpring of 2023
FINISH DATE2024
DEVELOPERHANN Development
Construction Area100.000 m2

October – December 2022

Phase 1 Completed

The HANN Harmony obtained building permit for a residential complex.
First phase of development will consist exclusively of villas. Work will begin in 2023.

hann harmony

Phase 2 Completed

Prepare the land for construction.

https://hanndevelopment.ro/wp-content/uploads/2022/11/hann-winter-768x432.jpg
vile de vanzare
vile cu predare in 2024
[bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

January – April 2023

Phase 3 Completed

We opened a showroom for presentation our project.

office hann harmony

Phase 4 Completed

We start to construct the fundation of villas.

vile in constructie ilfov
https://hanndevelopment.ro/wp-content/uploads/2022/11/WhatsApp-Image-2023-04-13-at-13.52.26-768x432.jpeg
fundatie vila hann

Phase 5 Completed

The fundation and structure is under construction.

https://hanndevelopment.ro/wp-content/uploads/2023/05/WhatsApp-Image-2023-05-25-at-11.44.48-_1_-768x432.webp
https://hanndevelopment.ro/wp-content/uploads/2023/05/WhatsApp-Image-2023-05-25-at-11.44.47-_1_-768x432.webp
case in ilfov

Phase 6 Completed

Ground floor is under construction.

https://hanndevelopment.ro/wp-content/uploads/2023/05/WhatsApp-Image-2023-05-25-at-11.44.48-768x432.webp
https://hanndevelopment.ro/wp-content/uploads/2023/05/WhatsApp-Image-2023-05-25-at-11.44.46-2-1-768x432.webp
https://hanndevelopment.ro/wp-content/uploads/2023/05/WhatsApp-Image-2023-05-25-at-11.44.32-1-768x432.webp
[bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

May 2023

Phase 7 Completed

First floor is under construction.

hann harmony
https://hanndevelopment.ro/wp-content/uploads/2023/05/WhatsApp-Image-2023-05-25-at-11.44.38-1-768x432.webp
https://hanndevelopment.ro/wp-content/uploads/2023/05/WhatsApp-Image-2023-05-25-at-11.44.48-768x432.webp

Phase 8 Completed

The walls and the roof is under construction.

ansamblu rezidential case
cartier vile bucuresti
case cu rate la dezvoltator bucuresti
cartier case bucuresti
[bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

Summer of 2023

Phase 9 Completed

Construction stage are according to the established calendar.

cosmopolis casa
complex rezidential vile bucuresti
case cu rate la dezvoltator bucuresti

Phase 10 In Work

The first villas have been built and are almost finished.

ansamblu rezidential case bucuresti
complex rezidential vile bucuresti
case vanzare cosmopolis
[bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

Summer of 2024

Project Completed

The estimated deadline for completing the works on the current construction phase is set for the summer of 2024.

complex de case
[bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

TEHNICALConstruction details

TEHNICALConstruction details

The infrastructure of the villas in the HANN Harmony residential project consists of continuous foundations under the ground floor pillars, made of reinforced concrete, in an inverted T shape, with a reinforced concrete sole. A layer of simple concrete, at least 5 cm thick, is placed under the inverted T-shaped beam, which ensures the necessary ground embedding. Materials: plain concrete (C8/10), reinforced concrete (C20/25), steel (Bst500S).

The structural system of the buildings is made of reinforced concrete frames, arranged in orthogonal directions. The positioning of the beams and the dimensions of their sections meet the rigidity criteria and comply with architectural conditions. We made sure that in the construction of the structures of each housing unit, the conditions imposed by the current codes, standards and design norms are respected โ€“ including the seismic protection legislation, namely the P100-1/2013 code. Materials: reinforced concrete (C30/37), steel (Bst500S).

Ensuring a high fire resistance was also taken into account in the design โ€“ and construction โ€“ of the HANN Harmony villas. Thus, the external walls will be made of 30 cm BCA-type blocks, while the finishes of the faรงades will observe the requirements of the Bs3d1 fire reaction class (at least) โ†’ this includes materials with a limited contribution to fire, which burn without flashover (the generalized spread of fire, to all combustible materials), with smoke release, but a medium indicative for producing drops.

More specifically, a 10 cm thick insulation system will be used (composed of 10 cm EPS80 polystyrene, white or gray decorative plaster, reinforced with fiberglass), along with wet faรงade systems, with gray ceramic tiles (or a similar color). The carpentry will be PVC, in an anthracite gray color, with thermal break and tripan insulating glass (3 sheets), low-E.

As for the interior finishes, we mention:

– 10 mm laminated parquet in bedrooms, dressing rooms / storage spaces, hallways;

– non-slip ceramic tiles in bathrooms and sanitary groups, in the living room and technical spaces;

– washable paint in rooms, respectively ceramic tiles in bathrooms and kitchens;

– plasterboard or cement mortar plaster, plus washable paint, for ceilings;

– metal house-entry doors, respectively solid, hinged, MDF interior doors.

cartier vile bucuresti
cartier vile bucuresti
cartier case bucuresti
case cu rate la dezvoltator bucuresti
case vanzare cosmopolis
case cu rate la dezvoltator bucuresti
case direct dezvoltator
vila cosmopolis
WhatsAppetape santier hann harmony Image 2023-05-25 at 18.27.58 (1)
WhatsApetape santier hann harmonyp-Image-2023-05-25-at-11.44.48
hann harmony
etape santier hann harmonypp Image 2023-05-25 at 11.44.46 (2)
WhatsApp Imaetape santier hann harmonyge 2023-05-25 at 11.44.38
ansamblu rezidential case
WhatsApp Imetape santier hann harmonyage 2023-05-25 at 18.27.59 (1)
etape santier hann harmony
WhatsApp-Ietape santier hann harmonymage-2023-05-25-at-11.44.49
WhatsApp-Imaetape santier hann harmonyge-2023-05-25-at-11.44.48-_1_
Whaetape santier hann harmonytsApp-Image-2023-05-25-at-11.47.45-_1_

BOOK YOUR VILLA

https://hanndevelopment.ro/wp-content/uploads/2022/11/official-logo-hann-development-scaled.webp
Adress: Europa Street, ศ˜tefฤƒneศ™tii de Jos, Ilfov

Follow us on social media:

VILLAS TYPE

Follow us on social media:

CALL US

Modern and spacious villas, with private gardens and multiple amenities. A family house that is a pleasure to live in!

ยฉ 2024 HANN Development.
Powered by imoPR.ro